Projects Out to Bid

Link to Urbandale Bid Postings

To view plan documents after a project has been let: Click the link above and toggle the "Show Closed Bids" box near the top of the page.

Notice to Bidders

Bid Addendums- Please sign in again on the next page after clicking the Addendum link

Plan Holders List

Bid Tabulations

  1. Bid Tab-2019-08-05-Douglas Avenue Frontage Road Right-In Right-Out Access
  2. Bid Tabulation All-Inclusive Playground.pdf
  3. Urbandale PPWMF - Bid Tab
  4. Bid Tabulation- 2019 Sanitary Sewer Lining Program
  5. Bid Tab Northpark Drive Trail 86th to 100th Street
  6. Bid Tab 2019-022 Fire Station 41 Patching
  7. Bid Tab 2019-023 ADA Improvements
  8. Bid Tab 2018 Sidewalk Repair Program
  9. Bid Tabulation - 2019 Traffic Signal Improvements
  10. Bid Tabulation-Meredith Drive, 156th to 170th Street
  11. Bid Tabulation - 2019 Storm Sewer Intakes
  12. Bid Tabulation- 2019 PCC Reconstruction Program
  13. Bid Tabulation- 86th Street Preservation Phase II
  14. Bid Tab - 104th Street Reconstruction Project
  15. Bid Tab-72nd Street Reconstruction Project
  16. Bid Tabulation- Northpark Water Main
  17. Urbandale Fire station 43 - Bid-Tab Final Results
  18. Bid Tabulation- 2018 Sanitary Sewer Spot Repair Program
  19. Bid Tabulation- 2018 Stormwater Project
  20. Bid Tabulation- 2018 Sanitary Sewer Lining Program
  21. Bid Tab- 2018 Concrete Purchase
  22. Bid Tabulation - Battery Backup Project
  23. Bid Tabulation - Traffic Signal Improvements
  24. Bid Tabulation - Claiborne Circle Trail Replacement
  25. Bid Tabulation - Meredith Fiber Project
  26. Bid Tabulation - 2018 Storm Sewer Intakes
  27. Bid Tabulation- Bent Creek Ridge Trail
  28. Bid Tabulation - 2018 PCC Patch Phase 1
  29. Bid Tabulation - 2018 PCC Patch Phase 2
  30. Bid Tab- Waterford Rd, Aurora Ave Sidewalk, 170th St. Ditch
  31. Bid Tabulation - 86th St Retaining Wall
  32. Bid Tab-2017 Sidewalk Repair Program
  33. Bid Tab 2016 Sidewalk Repair Program
  34. Bid Tabulation - 2017 Traffic Signals Improvement
  35. Bid Tabulation- Pedestrian Head Upgrade
  36. Bid Tab - Memorial Tree Park Trail Replacement
  37. Bid Tabulation - Douglas Parkway and 142nd Street Pavement Improvements
  38. Bid Tabulation - 75th Street and Douglas Ave Intersection Improvements
  39. Bid Tabulation - Douglas Ave Gateway Enhancements
  1. Dave McKay

    Director of Engineering and Public Works

  2. Engineering


    Physical Address
    3600 86th Street
    Urbandale, IA 50322

    Phone: 515-278-3950


  3. Public Works

    Physical Address
    9401 Hickman Road
    Urbandale, IA 50322

    Phone: 515-278-3950