  1. 142nd Street Widening Project

    This project would provide for the widening of 142nd Street to a four lane with left turn lanes at all street intersections from Hickman Road to the Walnut Creek Bridge.

    Link to page
  2. Meredith Drive- 128th Street to 142nd Street

    Proposed is the construction of a four-lane roadway for Meredith Drive, beginning at 128th Street and extending west to 142nd Street.

    Link to page
  3. 100th Street Interchange

    Proposed is the construction of an interchange at 100th Street and Interstate 35/80. In 2017 the ramps would be graded and in 2018 the ramps would be paved.

    Link to page
  1. Douglas Parkway Turn Lane at 121st Street

    Proposed is the installation of a right turn lane on Douglas Parkway at 121st Street. This right turn lane would serve a private drive into the Kum & Go site in the northeast corner of this intersection and 121st Street. A development agreement has been executed between the City and Kum & Go to fund this project.

    Link to page
  2. 2017 PCC Patching Program

    The 2017 PCC patching program includes areas in Golfview estates and the Merle Hay Frontage Road.

    Link to page
  3. Aurora Avenue reconstruction

    This project is the reconstruction of Aurora Avenue from 109th Street to the Railroad Crossing. The existing pavement will be replaced with an urban cross-section, including curb and gutter and storm sewer.