Waterford Road - 156th to 170th

Description

This project provides for the reconstruction of Waterford Road from 156th Street west to 170th Street as a four-lane roadway with left-turn lanes including grading, storm sewer, and a new bridge. The paving will be portland cement concrete with two 25-foot wide paving sections and a 15-foot grass median. The project will also include the construction of a second bridge over Walnut Creek. The bridge will be built to ultimately provide for 4-lanes of traffic and a 10-foot wide sidewalk on the north and south sides. A trail connection under the bridge will also be provided on the west side of the creek.

Project Status Update - 10/01/19

The contractor will be responsible for maintenance of the seeded areas until good growth is established.